Partitions decide how an office works: how many rooms you get and how much noise travels across the floor. They also vary more between quotes than most items, because a board wall, a frameless glass room and a demountable system can differ several times over for the same length of wall.
This guide puts published 2026 partition prices in Singapore side by side: board and glass partitions, glass doors, demountable systems, workstation partitions, desk dividers and removal at lease end. Every figure links to its source, checked on 17 October 2026, and is shown as published, not averaged. For the whole fit-out budget, see our office renovation cost guide.
Office partition cost in Singapore: the short answer
Published rates for a drywall (gypsum board) partition start from S$3.30 per sq ft at one specialist (Plasterceil), while guides that price a finished wall with skim coat, paint or door openings quote S$20–40 per sq ft (RKEC) or S$25–45 (Nextech) and one office fit-out guide budgets S$40–80 per sq ft (Office:reno). Glass is dearer: FixMove lists framed glass at S$45–80 per sq ft and frameless tempered glass at S$60–120 per sq ft. A single glass swing door adds about S$1,180–1,800 (HDDoor, Design Bureau). Removing a drywall partition at lease end is about S$30–80 per square metre including make-good (reinstate.sg).
Published office partition prices (2026)
We checked each page on 17 October 2026. Sources quote per square foot, per square metre, per linear foot or metre, or per item, so compare like with like: one square metre is about 10.8 sq ft. Check whether a rate is for a bare board wall or a finished one with paint, doors and cut-outs.
| Partition type | Published price (indicative) | Source and notes |
|---|---|---|
| Drywall partition, specialist starting rates | Regular gypsum board from S$3.30 psf; acoustic from S$4.30; 1-hour fire-rated from S$6; 2-hour fire-rated from S$9 | Plasterceil; direct installer’s “starts from” rates |
| Drywall partition per square metre | Standard drywall S$55–95 per sqm; 1-hour fire-rated S$90–130 per sqm | Fortified |
| Partition board (gypsum), installed | Single layer S$80–130 per sqm, including stud frame, taping, plastering and one coat of paint; double-layer acoustic with insulation S$130–200 per sqm | Hock Star |
| Drywall wall, finished ready for paint | S$20–40 psf; a typical 72 sq ft room-dividing wall S$1,500–2,800; short stub or half-height wall S$600–1,200 | RKEC; residential guide |
| Drywall by board type | Standard 12 mm S$25–45 psf; acoustic double board with Rockwool S$45–75; moisture-resistant S$35–55; 1-hour fire-rated S$50–80 | Nextech |
| Office drywall, all-in budget | S$40–80 psf, depending on thickness, finishes, doors and electrical cut-outs; a 10 sq ft straight run about S$400–800 | Office:reno |
| Acoustic upgrades to drywall | Rockwool in the cavity +S$3–6 psf; double boarding +S$5–10 psf (RKEC); Rockwool adds about 30–50%, so a S$500 partition becomes about S$650–750 (Deconstruct) | RKEC, Deconstruct |
| Door opening in a drywall partition | +S$250–600 per opening, door leaf extra (RKEC); +S$250–600 per door and frame (Nextech) | RKEC, Nextech |
| Glass partition per sq ft or linear ft | Framed glass S$45–80 psf; frameless tempered S$60–120 psf; room glass partition from S$120 per linear ft | FixMove, FixMove glass doors |
| Glass partition per square metre | Aluminium-framed glass S$180–350 per sqm (Fortified); framed S$200–300, frameless S$300–450 per sqm (Hock Star) | Fortified, Hock Star |
| Office glass, single and double glazed | Single glazed S$120–180 psf; double glazed S$180–260 psf | Office:reno |
| Double glazing and privacy finishes | Soundproof double glazing +S$120–280 psf; frosted film +S$15–28 psf; custom etched or branded film +S$80–220 per sqm (FixMove); frosted or sandblasted glass +S$20–50 per sqm (Hock Star) | FixMove, Hock Star |
| Glass meeting rooms, whole jobs | Standard office single room (10×12 ft) S$2,500–4,500; office meeting room S$1,800–4,500; multi-room fit-out S$5,000–8,000+ | FixMove; planning ranges |
| Glass doors | Clear tempered swing door with soft-close floor spring S$1,180; double-leaf swing door S$2,360 (HDDoor sale prices, installation not stated); single glass door with patch fittings S$1,200–1,800 installed, double doors S$2,500–3,500 (Design Bureau) | HDDoor, Design Bureau |
| Demountable, modular and operable walls | Modular demountable systems S$150–300 per linear metre (Design Bureau); demountable costs about 30–50% more than drywall (Fortified); acoustic panel systems S$150–280 psf, operable walls S$200–350 psf (Office:reno) | Design Bureau, Fortified, Office:reno |
| Workstation and cubicle partitions | Fabric partition workstation 1-seat S$899, 2-seat S$1,199, 4-seat S$1,399 (Linear Furnishings); partition system for 6 seats, partition only, S$1,127; half-glass high divider 1.8 m × 2.7 m S$1,194 (Baycus) | Linear Furnishings, Baycus; retail list prices |
| Desk dividers | Polyester or frosted acrylic panel S$30–50 (U Office); 9 mm acoustic panel S$50–60; 6 mm tempered glass S$99–129 (iSimply); 12 mm PET divider S$79 (MyDesk) | U Office, iSimply, MyDesk |
| Partition removal at lease end | Drywall S$30–80 per sqm incl. disposal and patching; glass S$60–120 per sqm (reinstate.sg); S$400–1,200 per wall (Express Reinstatement); S$8–18 per metre (BSM) | reinstate.sg, Express Reinstatement, BSM Engineering |
| Fees and surcharges | S$10 fuel surcharge per visit (FixMove); building management submission S$100–500 and refundable MCST renovation deposit S$1,000–5,000 (Express Reinstatement); off-hours work adds 15–25% to labour (Design Bureau) | FixMove, Express Reinstatement, Design Bureau |
What drives partition cost
- Material: board is cheapest, framed glass costs more and frameless or double-glazed glass the most. Office:reno prices double-glazed office glass at S$180–260 psf against S$120–180 for single glazing.
- Acoustic performance: insulation and extra boards add cost. RKEC lists Rockwool at +S$3–6 psf and double boarding at +S$5–10 psf.
- Fire rating: fire-rated board costs more than standard board; Plasterceil starts 1-hour walls at S$6 psf and 2-hour walls at S$9 psf.
- Height and layout: walls that run to the slab cost more than walls that stop at the false ceiling, and corners take longer than straight runs.
- Doors and services: each door, socket, data point or card reader adds frames, hardware and labour.
- Working hours: buildings that limit noisy work to nights or weekends push up labour cost.
What is usually included, and what is not
A partition rate normally covers the stud frame, boards or glass, fixing and basic finishing. Hock Star includes taping, plastering and one coat of paint in its gypsum rate, while RKEC prices a wall ready for paint and lists doors, insulation and double boarding as extras. FixMove prices door systems and privacy film separately from the glass. Often charged separately:
- doors, locks and closers;
- insulation and double boarding;
- painting or laminate finishes;
- power and data points in the wall;
- sprinkler, smoke detector and aircon changes;
- building submissions, deposits, after-hours work, disposal and GST.
Ceiling, painting and floor work around new partitions is covered in our false ceiling, painting and flooring cost guides.
Partitions for offices, shops and commercial premises
In a commercial building, partitions usually need landlord or MCST approval before work starts, under the building’s fit-out manual. FixMove notes that no glass partition is automatically BCA or SCDF compliant: it depends on the building, use and escape routes. Design Bureau says SCDF requires fire-rated partitions in some places, such as walls separating escape routes or enclosing fire-hazard rooms. New rooms can also mean moving sprinklers and smoke detectors, which our office renovation guide prices.
Offices and malls often allow noisy work only after hours. Fortified offers phased or after-hours installation for live offices and for retail units working around mall trading hours, and Design Bureau puts the off-hours labour premium at 15–25%. For shops, see the retail shop renovation cost guide.
Plan for the end of the lease too. Most landlords want tenant partitions removed, and reinstate.sg prices drywall removal at S$30–80 per square metre, with glass removal higher. GetContractor Reinstatement lists removal and hacking of wall partitions in its reinstatement scope. See our office reinstatement cost guide.
Some partition and fit-out businesses to ask for a quote
The first two entries are featured partners; the others are not ranked and none paid to appear. Descriptions summarise each company’s own website or SG Directory listing. More firms are in the Commercial Fit-Out directory and our guide to commercial renovation contractors.
- GetContractor Renovation (SG Directory listing · website): the renovation arm of Trends Interior Design Pte Ltd, a direct fit-out contractor for offices and shops since 1999. Its in-house team handles partitions together with carpentry, electrical, flooring, plumbing and painting, plans layouts around each building’s fit-out rules and gives a scoped quote within 24 hours.
- GetContractor Reinstatement (SG Directory listing · website): Trends Interior Design’s reinstatement team for offices and shops, covering removal and hacking of wall partitions, ceilings and flooring, debris disposal and MCST or landlord submissions at lease end.
- Yuen Mai Glass Merchant (SG Directory listing · website): glass and mirror supplier and fabricator offering office glass partitions and glass whiteboards, plus glass doors and mirrors.
- NSK & B (SG Directory listing · website): interior finishing sub-contractor whose own crew installs drywall partitions, false ceilings, plaster and tiles, working for main contractors and interior design firms.
- V3 Contracts (SG Directory listing · website): renovation and fit-out contractor for homes and commercial spaces, whose in-house team handles partition and ceiling works alongside electrical, plumbing and painting.
- Systmz (SG Directory listing · website): modular fit-out specialist for healthcare and laboratory spaces since 2009, with an interior design-and-build arm.
How to get an accurate partition quote
- Send a floor plan marking each partition and whether it runs to the ceiling or the slab.
- Say what each room is for, so the contractor can propose the right acoustic or fire rating.
- Specify board type, insulation, glass thickness, framing and any film.
- List the doors, sockets and data points in each wall.
- Share the building’s fit-out manual and ask whether submissions, disposal and GST are included.
Red flags
- A per-sq-ft price with no board, glass or height specification.
- No mention of fire rating for walls near escape routes or risers.
- Glass partitions quoted without door hardware.
- Starting work before the landlord or MCST has approved the plans.
- No written scope, warranty or company details.
Office partition cost: FAQ
How much does a drywall partition cost per sq ft in Singapore?
Published starting rates begin at S$3.30 psf for a regular board wall (Plasterceil). Guides that price a finished wall quote S$20–40 psf (RKEC) or S$25–45 psf for a standard 12 mm board (Nextech), and one office guide budgets S$40–80 psf (Office:reno).
How much does a glass partition cost in Singapore?
FixMove lists framed glass at S$45–80 psf and frameless tempered glass at S$60–120 psf. Office:reno quotes S$120–180 psf for single-glazed office glass and S$180–260 psf for double glazing.
How much is a glass door for an office?
HDDoor lists a clear tempered swing door with a soft-close floor spring at S$1,180 and a double-leaf door at S$2,360. Design Bureau puts a single glass door with patch fittings at S$1,200–1,800 installed.
How much does it cost to soundproof a partition?
RKEC adds S$3–6 psf for Rockwool and S$5–10 psf for double boarding. Deconstruct says Rockwool usually adds 30–50% to the partition price, not double.
How much does partition removal cost at the end of a lease?
About S$30–80 per square metre for drywall including disposal and patching, and S$60–120 per square metre for glass (reinstate.sg). Express Reinstatement quotes S$400–1,200 per wall, depending on type and size.
Get free office partition quotes
Tell us about your premises and the rooms you want to create, and we’ll connect you with Singapore partition and fit-out contractors who can quote for free.