Office Reinstatement Contractors in Singapore

When an office or shop lease ends, most Singapore tenancy agreements require the unit to be returned to its original or bare condition, and the reinstatement must be finished before the handover date. A late or incomplete job can cost you extra rent or part of your deposit. This hub lists contractors that carry out office and retail reinstatement and that we could verify: each is an ACRA Live Company, holds a current BCA registration and runs a working website. Typical work covers removing partitions and carpentry, dismantling electrical and aircon installations, restoring ceilings and floors, repainting, clearing debris and preparing landlord or MCST submissions. Ask every contractor for an itemised quotation after a site visit and check it against the reinstatement clause in your lease. Our cost guide explains the usual price range per square foot, a tenant checklist and the timeline to plan for.
GetContractor Reinstatement
Trends Interior Design has carried out office and retail reinstatement in Singapore since 1999 with its own team and no subcontractors. It takes units back to bare condition: dismantling electrical and aircon, removing partitions, restoring ceilings and floors, repainting, clearing debris and doing the final clean. It also prepares the MCST and landlord submissions and SCDF approvals, so handover goes smoothly. It quotes within 24 hours, and small jobs can be finished in as little as a day.
21 verified office reinstatement contractors
Sorted by verified facts; click a column heading to sort. Registration data from BCA via data.gov.sg; "registered until" is the latest expiry of the firm’s current BCA workheads.
| Company | Area | BCA workheads (grade) | Registered until | Verified facts |
|---|---|---|---|---|
| Anderco Pte. Ltd. | Tuas | CW01 B1, CW02 C1, CR01 Single Grade, CR06 L3 | 2027-08-01 | 6/8 |
| Azcendant Private Ltd. | Sembawang | CR01 Single Grade, CR06 L1, CR09 L1 | 2027-08-01 | 6/8 |
| Bespoke Builders Pte. Ltd. | Sembawang | CW01 C3, CR01 Single Grade, CR06 L1 | 2027-11-01 | 6/8 |
| Diamond Glass Enterprise Pte. Ltd. | Bedok | CW01 C3, CR01 Single Grade, CR06 L1, CR09 L2 | 2028-11-01 | 6/8 |
| Lhn Parking Pte. Ltd. | Downtown Core | CR01 Single Grade, ME04 L1 | 2028-03-01 | 6/8 |
| Long Zhou Engineering Pte. Ltd. | Sembawang | CW02 C1, CR01 Single Grade, ME12 L3 | 2027-11-01 | 6/8 |
| Mega Exhibition Events Private Limited | Toa Payoh | CR01 Single Grade, ME05 L1 | 2027-12-01 | 6/8 |
| Office Empire Pte. Ltd. | Sembawang | CR01 Single Grade, CR06 L1, CR09 L1 | 2028-01-01 | 6/8 |
| Sing Tatt Construction Pte. Ltd. | Woodlands | CW01 B2, CW02 C1, CR01 Single Grade, CR06 L3 | 2027-07-01 | 6/8 |
| Techart Global Pte. Ltd. | Sungei Kadut | CR01 Single Grade, CR06 L5, ME01 L1, ME05 L1, ME06 L1 | 2028-10-01 | 6/8 |
| Yse Global Pte. Ltd. | Bukit Batok | CW01 C3, CW02 C1, CR01 Single Grade, ME01 L5, ME04 L3, ME05 L6, ME06 L2 | 2027-07-01 | 6/8 |
| Albedo Design Pte. Ltd. | Toa Payoh | CR01 Single Grade, CR06 L3 | 2029-02-01 | 5/8 |
| Buildwerkz Builders Pte. Ltd. | Sungei Kadut | CW01 C3, CR01 Single Grade, CR06 L3, CR09 L1 | 2027-06-01 | 5/8 |
| Guru Construction Pte. Ltd. | Woodlands | CR01 Single Grade | 2028-02-01 | 5/8 |
| Homeworks Consultancy Pte. Ltd. | Sembawang | CR01 Single Grade, CR06 L3 | 2027-09-01 | 5/8 |
| Joon Thiam Industrial Services Pte. Ltd. | Sungei Kadut | CW01 C3, CW02 C3, CR01 Single Grade, ME12 L1 | 2027-11-01 | 5/8 |
| Leap Integrated Pte Ltd | Toa Payoh | CW01 C1, CR01 Single Grade, CR06 L5, ME01 L4, ME05 L5, ME06 L4, ME12 L4, ME15 L5 | 2028-09-01 | 5/8 |
| Shin Guan Pte. Ltd. | Tuas | CR01 Single Grade | 2028-02-01 | 5/8 |
| Skyline Built Pte. Ltd. | Geylang | CR01 Single Grade | 2027-07-01 | 5/8 |
| Skyrus Engineering Pte. Ltd. | Bukit Merah | CR01 Single Grade | 2028-07-01 | 5/8 |
| Systmz Pte. Ltd. | Sungei Kadut | CR01 Single Grade, CR06 L5 | 2028-11-01 | 5/8 |
Office Reinstatement Contractors by area
Cost guides
Frequently asked questions
How much does office reinstatement cost in Singapore?
It depends on how much was built during the fit-out. Our office reinstatement cost guide lists the published 2026 figures per square foot and a tenant checklist.
How long does office reinstatement take?
Small units can be done in a few days; larger offices often take one to three weeks, plus time for landlord inspection. Start planning two to three months before the lease ends.
Do I have to reinstate to bare condition?
It depends on your lease. Some landlords accept the fit-out as-is or ask only for partial reinstatement; get the requirement in writing before you take quotes.